A Fitting Refresh
Project Goals:
– New vanity including new cultured stone countertops with integrated sinks and new faucets.
– New cultured stone shower in master bathroom with Sterling tub/shower in hallway bathroom including grab bars and new shower fixtures.
– Removal of ceiling soffit/bulkhead with drywall patching.
– New framed mirrors and vanity lighting.
– New bath fans.
– New luxury vinyl plank flooring.
– Semi-frameless glass door in shower.
– Full height linen cabinet in master bathroom for storage.
Project Cost Category: Bathroom Midrange Economy
Project Overview
The bathrooms were feeling sad...and outdated. The goal was to update each to bring them up to date and make them feel more welcoming. Both upstairs bathrooms were updated at the same time. The homeowner decided it best to keep a bathtub in one of the bathrooms for the possibility of resale in the future. The owners bathroom shower was updated from a tub/shower to a walk-in shower. The layout of each bathroom stayed the same but everything was gutted out and updated.
Project Foreman
Ian Blandthorn
Project Designer
Mark Dixon
Design Concepts


Project Timeline
Production Start
February 13, 2023
Project Completion
May 18, 2023