Service Overview

The kitchen was greatly expanded and opened up by adding a support beam. The large open area includes new flooring, cabinets, countertops, sink, faucet, updated recessed can lighting. The laundry was moved from the basement to the main floor with a reconfiguration to the room. A double french door was closed up to allow for more storage space and a better flow. The master bathroom was also gutted and remodeled as part of their full remodel project.

Customer's Wishes

New. The customers wanted a major gut and remodel of their kitchen, dining area, laundry, and bathroom. The goal was to open up the kitchen and give it enough room for multiple people to be in the kitchen at the same time. The goal was to re-imagine each space to improve the look and function of each room. The end result is a beautiful transformation and it is hard to imagine the way it looked before!

Location: Lansing, MI

Project Completed: 2019

Designer: Mark Dixon

Foreman: