Modern Farmhouse Update

Project Goals:

  • Full layout change to the bathroom.
  • Utilize antique furniture purchase for replacement vanity.
  • Remove shower and replace with walk-in linen closet.
  • Remove tub and replace with large walk-in tile shower.
  • Replace all bathroom fixtures.
  • Update bathroom flooring.

Project Cost Category: Bathroom Midrange Designer

Project Overview

An update to their bathroom with improved functionality and an update to the design. Many portions of the home have been updated and the goal was to get this portion of the home to meet the design of the home. A full remodel including a change to the layout of the bathroom. The scope of work included full demolition of the bathroom including haul off of materials and update to existing plumbing and electrical for new bathroom layout. Custom work on furniture piece to create a custom vanity with sink. New tile floor and tile shower with semi frameless glass shower door. Shower includes wall niche and bench. Build out of linen closet and update to laundry closet. The project also included an update to two doors and filling in a door with a window.

Project Foreman

Nick Childers

Project Designer

Jaime Dunn

Design Concepts

Project Timeline

Project Completion

March 16, 2022