A Pop of Color
Project Goals:
- Update to the existing upstairs bathroom.
- Update the vanity with a new Pioneer Cabinets double sink vanity with custom paint color.
- Install new tile flooring.
- Install updated Kohler Sterling tub/shower surround with new sliding glass door.
- Update all fixtures.
Project Cost Category: Bathroom Midrange Designer
Project Overview
This returning client was ready to improve the look of the upstairs bathroom by bringing some color and life to the room. White and grey were off the table with the desire to have some fun by playing with color with cabinets, countertop, and flooring. Full bathroom remodel with a complete removal and replacement. This project also included a replacement of the front door as well as painting in the entry and foyer area. The beautifully stained front dutch-door adds an elegant splash of color to the front of the home.
Project Foreman
Project Designer
Jerry Dowell
Design Concepts


Project Timeline
Project Completion
May 30, 2020