Amazing What an Update Can Do!
Project Goals:
- Replace cabinetry with Pioneer Cabinetry to make more useful storage.
- Update shower (big priority) using Onyx Collection cultured stone base and surround.
- Update bathroom flooring.
- Brighten the space.
Project Cost Category: Bathroom Midrange Economy
Project Overview
The existing bathroom was similar to many bathrooms with many portions out of date. The bathroom was functionally but in need of a refresh. The homeowner in particular did not like the basin/shower. The bathroom remodel included removal of a portion of wall to open up shower including moving plumbing supply location. The vanity was updated as well with a chase in the wall to the right of the vanity. We updated the bathroom heat supply to bring to code, updated the flooring and electrical as well including the lighting. This bathroom was essentially gutted down to studs and updated.
Project Foreman
Phill Nanasy
Project Designer
Jaime Dunn
Design Concepts


Project Timeline
Project Development Start
May 12, 2023
Production Start
September 5, 2023
Project Completion
December 1, 2023