Relocate to Renovate
Project Goals:
- Relocate shower to provide more space for larger shower.
- Move toilet location and provide large linen cabinet.
- Remove and replace vanity cabinet with new quartz countertop with undermount sinks.
- Update mirrors, fixtures, and flooring.
- Update vanity lighting.
- Keep existing tub with tile surround.
- Remodel main floor half bathroom.
Project Cost Category: Bathroom Midrange Designer
Project Overview
An update to a bathroom that was starting to feel outdated. The bathroom is large but had a small shower in the corner. The goal was to change the location of the shower to improve the functionality of the shower and provide a better location for the toilet. Remodel of existing upstairs master bathroom with change to layout and location of shower, linen cabinet, and toilet to improve shower design and functionality of the bathroom. New vanity cabinet, countertop, mirrors, jacuzzi tub tile, floor tile, shower, frameless glass hinged door, toilet, paint, vanity lighting.
Project Foreman
Dan Nanasy
Project Designer
Mark Dixon
Design Concepts


Project Timeline
Project Completion
May 12, 2021