Double the Fun
Project Goals:
- Remodel both upstairs bathrooms (primary and hall bathroom).
- Pull and replace updates for each bathroom.
- Replace door to primary bathroom with pocket door to give more space in bathroom.
- Remove tile shower and replace with cultured stone shower.
- Update vanities, commodes, and bathroom fixtures.
- Replace flooring in each bathroom.
Project Cost Category: Bathroom Midrange Economy
Project Overview
A complete refresh with a more modern feel as they update their home. In the master bathroom, the client wanted to replace their hinged door with a pocket door to eliminate having the door take up valuable space in the bathroom. We completed the remodeling of both of these bathroom in Mason. The goal was a complete refresh of both bathrooms with a new fresh style. The goal was to achieve the most impact while sticking to a tight budget. Material selections and design keyed into the customer goals while working to keep costs down. The designer (Mekisha) worked with the client on suggestions and ways to reduce overall costs while still working to achieve the project goals. The result was a remodel of two very beautiful bathrooms!
Project Foreman
Dan Bronkema
Project Designer
Mekisha Johnson
Design Concepts


Project Timeline
Project Completion
December 23, 2020