Pull and Replace Perfection
Project Goals:
- Keep existing kitchen layout with update to cabinets, countertops, flooring, and lighting.
- Replace existing sink with new undermount sink along with new quartz countertops.
- Remove trash compactor and install new drawer bank cabinet.
- Keep existing soffits to reduce remodeling costs.
- Update all appliances including installation of slim microwave.
Project Cost Category: Kitchen Midrange Economy
Project Overview
The homeowners were ready to get rid of their orange countertops! The cabinets were dark an contributed to making the kitchen feel smaller than it was. The layout and storage of the kitchen worked great for them and the goal was to brighten and refresh the existing space. They worked in design to find materials that would compliment the flooring that was to remain and to keep within the existing footprint of the kitchen to not require updates to the flooring. Update of an existing kitchen and half bathroom. Update included new cherry cabinets with minor modification to layout, new quartz countertops, new appliances, update to lighting and electrical, painting of kitchen, new cabinet hardware.
Project Foreman
Danniel Nanasy
Project Designer
Jaime Dunn
Design Concepts


Project Timeline
Production Start
October 1, 2023
Project Completion
January 10, 2024