Structural Safety in Deck Design

Project Goals:

  • Replace a sagging and unsafe roof overhang.  Included replacement of a large portion of the existing roof.
  • Update the structure of the deck along with the decking with new composite low maintenance decking.
  • Replace the stairs and railing.
  • Add a privacy screen.

Project Cost Category: Deck Composite Designer

Project Overview

The existing deck and roof were dangerous and needed to be fixed so they could enjoy the outdoors again! Removal of an existing deck and covered roof area. The existing roof was having major sagging issues due to improper support. The scope was to remove that area, redo the deck including the deck substructure with a new Trex composite deck and update the roof and overhang.

Project Foreman

Ian Blandthorn

Project Designer

Jerry Dowell

Project Gallery

Design Concepts

Project Timeline

Project Development Start

December 13, 2022

Production Start

March 6, 2023

Project Completion

May 30, 2023