Future Proofing the Home

Project Goals:

  • Convert existing half bathroom (powder bath) into a full bathroom.
  • Utilize existing den for the extra space required.
  • Add door to den room to create office/bedroom space.
  • Create a shower that is to help with future accessibility needs.

Project Cost Category: Bathroom Midrange Designer

Project Overview

The homeowner in this Holt Michigan home was wanting to ensure that she could stay in her home longer by converting the existing living room into a home office/bedroom space and using some of the space to expand the existing half bathroom into a full bathroom with shower, vanity, and toilet. One of the goals was to make the shower with a bench to make it more accessible for future needs.

Project Foreman

Ty Haskell

Project Designer

Jaime Dunn

Project Gallery

Design Concepts

Project Timeline

Project Development Start

August 27, 2024

Production Start

April 14, 2025

Project Completion

June 6, 2025