Out with the Old

Project Goals:

  • Remove existing fireplace that was no longer in use.
  • Reframe space to give room for a bathroom and closet adjacent to the primary bedroom.
  • Add full bathroom with Sterling Shower unit, pedestal sink, and new Kohler toilet.
  • Install luxury vinyl plank flooring.
  • Update lighting in bathroom and new closet.
  • Install standard closet shelving.

Project Cost Category: Addition Bathroom

Project Overview

With a growing family, the goal was to create a master bathroom in the home. The existing fireplace was drafty and no longer usable so the hope was to utilize that space for the addition of a new bathroom. Removing existing fireplace and master bedroom closets to create space for new bathroom and enlarged closet for a master bedroom suite. Removing existing fireplace and master bedroom closets to create space for new bathroom and enlarged closet for a master bedroom suite.

Project Foreman

Dan Bronkema

Project Designer

Mark Dixon

Project Gallery

Design Concepts

Project Timeline

Project Completion

October 15, 2021