From Soggy to Sturdy
Project Goals:
- The subfloor was failing in the bathroom due to previous water damage, the homeowner wanted to remodel the bathroom while repairing the subfloor.
- Brighten the space by updating the bathroom with new vanity cabinet, improved vanity lighting, new walk-in tub and shower surround, and illuminated mirror.
- Improve bathroom and showering accessibility by installing a walk-in bathtub/shower unit.
Project Cost Category: Bathroom Midrange Designer
Project Overview
This Williamston bathroom remodel started with a hole in the floor. The existing shower had leaked over time and rotted out the subfloor leaving a soft spot that was a danger to the homeowner. Even after the bathroom remodel was complete and the flooring was replaced and repaired, the homeowner was still in the habit of avoiding that spot! Odd Fellows Contracting updated the entirety of the bathroom with a new walk-in bathtub that includes a shower surround giving the option for either a bathtub or shower. The vanity cabinet was replaced with a new Pioneer Cabinetry cabinet including a new above the toilet storage cabinet. We brightened the space by adding an illuminated medicine cabinet mirror and new ceiling and vanity cabinet lighting. After the replacement of the subfloor, we installed new LVT flooring and baseboards. The plumbing was updated at the bathroom along with other changes to the home including new kitchen countertops and kitchen recessed LED lighting.
Project Foreman
Nick (Cutty) Childers
Project Designer
Jerry Dowell
Design Concepts


Project Timeline
Project Completion
March 21, 2025