Superior Use of Space

Project Goals:

  • Update the layout of the bedroom, bathroom, and closet.
  • Add a loft space for added needed storage.
  • Add a laundry space to the primary suite in the closet.
  • Expand the closet to add a laundry in the upstairs.
  • Remodel the existing bathroom and reconfigure the layout.
  • Add an office space that will temporarily be used as a nursery.

Project Cost Category: Bathroom Midrange Premium

Project Overview

In this East Lansing home, Odd Fellows Contracting had the pleasure of updating the existing second floor primary suite with a complete remodel. This remodel included a full update to the bathroom, closet, and bedroom space. The vaulted ceiling provided space for an option to create a loft space for additional storage. The access to the loft was accessible through a detachable ladder. The entirety of the primary suite space was updated including drywall touch-up, painting, and new flooring. The bathroom portion was updated with a new vanity and linen cabinet. The shower was updated from an older enclosed tile shower to a solid surface Onyx Collection material with an open half-wall and glass. The primary suite was re-framed to add an office space that will temporarily be used as a nursery space for their new baby!

Project Foreman

Ty Haskell

Project Designer

Jaime Dunn

Design Concepts

Project Timeline

Project Development Start

March 13, 2025

Production Start

April 24, 2025

Project Completion

August 11, 2025