From Sunken to Saved
Project Goals:
- Replace the sunken tub with a walk-in shower for accessibility.
- Update closet with improved storage.
- Replace vanity, countertop, sinks, and faucets to refresh the look of the bathroom.
- Brighten the space with improved lighting.
Project Cost Category: Bathroom Midrange Designer
Project Overview
This Williamston bathroom remodel completed by Odd Fellows Contracting helped solve a problem for the homeowner. The existing bathtub was recessed and created a difficulty for the homeowners to get in and out. it was a necessary solution when the house was built due to the roof and angled wall structure at that end of the home, but with some improved design and options, we were able to provide a full shower without sacrificing space. The replacement of the closet with cabinet storage gives improved organizational space that ties in with the new vanity cabinets to provide a more cohesive design feel to the bathroom. The updated material are easier to maintain and safe for the homeowner.
Project Foreman
Christopher Hicks
Project Designer
Mark Dixon
Design Concepts
We are currently gathering the design concept photos for this project. Please check back at a later time.
Project Timeline
Project Development Start
May 27, 2025
Production Start
September 10, 2025
Project Completion
November 24, 2025