From Sunken to Saved

Project Goals:

  • Replace the sunken tub with a walk-in shower for accessibility.
  • Update closet with improved storage.
  • Replace vanity, countertop, sinks, and faucets to refresh the look of the bathroom.
  • Brighten the space with improved lighting.

Project Cost Category: Bathroom Midrange Designer

Project Overview

This Williamston bathroom remodel completed by Odd Fellows Contracting helped solve a problem for the homeowner. The existing bathtub was recessed and created a difficulty for the homeowners to get in and out. it was a necessary solution when the house was built due to the roof and angled wall structure at that end of the home, but with some improved design and options, we were able to provide a full shower without sacrificing space. The replacement of the closet with cabinet storage gives improved organizational space that ties in with the new vanity cabinets to provide a more cohesive design feel to the bathroom. The updated material are easier to maintain and safe for the homeowner.

Project Foreman

Christopher Hicks

Project Designer

Mark Dixon

Project Gallery

Design Concepts

We are currently gathering the design concept photos for this project. Please check back at a later time.

Project Timeline

Project Development Start

May 27, 2025

Production Start

September 10, 2025

Project Completion

November 24, 2025