Service Overview

Remodel of existing kitchen with change to layout. Remodel of portions of master bathroom. New LVP flooring throughout the home. Painting throughout the home.

Customer's Wishes

The customer was in need of updates throughout the home and wanted to brighten things up as well as improve the function of spaces in the home. The tub was in need of being replaced with a walk in shower for easier access.

Location: Holt

Project Completed: 2022

Designer: Mark Dixon

Foreman: Christopher Hicks

Project Gallery