Transitional Elegance

Project Goals:

  • Update to kitchen to expand and provide more freedom and usable space.
  • Change layout and location of fixtures in kitchen.
  • Convert garage entry to mudroom with updated laundry, half-bathroom, and exit to backyard.
  • Keep existing flooring as much as possible and patch in where required.
  • Convert space at brick fireplace to usable storage.
  • Add island to the kitchen and introduce dual tones of whites and naturals.

Project Cost Category: Kitchen Midrange Premium

Project Overview

This kitchen remodel project started with exploration of different ways in which to improve on the kitchen space with exploration of options on how to use adjacent rooms along with how to improve the kitchen in place. After review of options, it was decided that the best option was to utilize the existing space but expand by eliminating the peninsula and convert to a kitchen with island. This allowed for the kitchen to expand up to the existing sliding door and gave more options for where to locate the range. By eliminating the soffits and expanding the kitchen, the kitchen feels much larger despite not having to make extensive modifications to other parts of the home. As part of the kitchen remodel, we patched in to the existing floor and you would never know that it wasn't all done at the same time. The kitchen design integrated white cabinets with a mix of more natural tones of stained white oak and natural tones on the Cambria quartz countertops. The countertop is accented with matching tones in the backsplash tile and offset with the updated bronze finish to the lighting fixtures, cabinet pulls, and handles. In addition to the kitchen remodel, the garage entry area was updated to create a mudroom complete with laundry and a half-bathroom. A door was added to the mudroom to create access to a deck that will be built in the future.

Project Foreman

Phill Nanasy

Project Designer

Jaime Dunn

Design Concepts

Project Timeline

Project Development Start

February 12, 2024

Production Start

May 1, 2024

Project Completion

October 2, 2024